Define Acceptance Criteria Before Testing

FAT should be based on the technical specification agreed during quotation. Document the required field values, uniformity, stability, temperature performance and any custom functions before the test begins.

Magnetic Field Performance Checks

Verify field range at the specified pole gap, field stability over time, uniformity in the defined volume and sweep repeatability. Record calibration data and any deviations.

Power Supply and Control Verification

Check current resolution, ripple, sweep linearity, protection functions and communication interfaces. Confirm that the power supply responds correctly to commands from the control software.

Interfaces and Safety Checks

Verify all electrical, mechanical and software interfaces. Test emergency stop, interlocks, thermal protection and quench detection where applicable.

Test Records and Documentation

Request test reports, calibration certificates, wiring diagrams, operation manuals and maintenance instructions. Well-documented FAT results simplify installation and future service.

Handover Checklist

Before shipment, confirm packing requirements, transport constraints, installation site conditions, training needs and the on-site commissioning plan. A clear handover checklist reduces installation delays.