Quality & Testing
Define how the system will be checked against the requirements before the order is finalized. The project scope establishes the test method, operating conditions, acceptance limits, and records to deliver.
What to check before shipment
- Magnetic field: Record the field at the agreed gap or aperture, probe positions, and operating points. Specify the field map and uniformity region where the experiment requires them.
- Power and cooling: Use the agreed load and duty cycle to check current, ramp behavior, cooling conditions, and protection response.
- Sample environment: Verify holder clearance, wiring, feedthroughs, and temperature or vacuum conditions as applicable. Define the leak-test method, limit, and boundary when a leak test is required.
- Readout and controls: Check the required signal path, software sequence, data export, and specified interlocks. Use an agreed sample, reference, or simulated input where appropriate.
Inspection, factory acceptance, and site acceptance
Inspection checks items such as the build, wiring, labels, and dimensions. Factory acceptance testing (FAT), when included, checks the assembled equipment before shipment against an agreed test plan. Site acceptance testing (SAT), if included, verifies the agreed functions after installation under site conditions.
Calibration and records
Ask for traceable calibration separately when your measurement requires it. Agree on the instrument, reference, range, uncertainty, and report. A test record documents the conditions and results of the agreed checks. Its scope is defined in the proposal.
Plan your acceptance checks
Send the operating points, tolerances, sample or load, records, and witness requirements. Discuss testing requirements or read the FAT checklist.